TR Stabilisation (TRS) were appointed by Caddick Construction Ltd to undertake remediation & ground improvement to enable the site for the proposed retail development known as Tawd Valley Centre, Skelmersdale WN8 6LU (The site).
Client
Location
Cost
Program
14 weeks
The works comprised the following:
- Removal of existing top-soils and re-use on site to form a reprofiled embankment, soils improvement for this purpose to achieve 50kN/m2 shear strength.
- Excavation of proposed attenuation tanks for tank installa- tion by client due excavation depth following site recon- touring.
- Backfilling of installed tanks following installation, in ac- cordance with manufacturers requirements
- Removal of existing concrete hardstands and paved areas and segregation on-site for re-processing.
- Excavation of existing soils to competent strata beneath proposed building and treatment to improve soils bearing capacity for shallow pad foundations and ground bearing floor slab solution.
- Large scale earthworks exercise with all unsuitable material treated to improve engineering properties as acceptable earthworks material to meet the requirements of MCHW Vol.1 series 600.
- Surface stabilisation of formation to achieve Hydraulically Stabilised Soils in accordance with MCHW Vol.1 series 800 cl.840 (Subbase Replacement)
- Extensive geotechnical testing of material re-use to verify the performance specification in line with the client con- sultant requirements.
- On site reprocessing of existing hardstands in accordance with WRAP quality protocol to produce both Granular 6F capping material and DoT Type 1 subbase for re-use within the proposed construction build-ups.
- Management and control of surface water, perched ground- water.
TR Stabilisation, adopted an holistic approach at early contract involvement, to ensure fixed costs where within budget, and de- livery of the project within the allocated timeframe accommodat- ing partial handover for release to follow on construction phase activities.
Environmental & Sustainability savings:
Reduced depletion of natural resources (aggregates) associated with Granular 6F, DoT Type 1 subbase.
Reduction in disposals off site to landfill, borrow pit adopted for groundworks arisings generated during the construction phase.
Reduction in Energy, Fuel and Emissions.