Explore Our TR Stabilisation Case Studies Collection
Former Guardian Printworks
Undertake remediation & ground improvement to enable the site for the proposed commercial development off Longridge Road Manchester M17 1SN (The site).
BAE System Zone 5
Ground improvement techniques for the design & build scheme of a new manufacturing facility within the confine of BAE Systems, Samlesbury.
Merseyside Police HQ
Develop an alternative proposal for the remediation and ground improvements for the construction of the new Merseyside police HQ.
JCB Cab Systems
Large scale earthworks activity at the site of a proposed new heavy cab system manufacturing facility ion the existing site of JCB (Uttoxeter).
UPS Apron Extension
Ground improvement to overall construction build-ups and minimise large scale disposal off site for the proposed UPS aeroplane apron extension.
South Cave, Hull
Developing a design whereby all material could remain on site and the site could be developed for the intended purpose with surface water run-off draining into existing no adopted surface water drainage receptors.
Skelmersdale Town Centre
TR Stabilisation (TRS) were appointed by Caddick Construction Ltd to undertake remediation & ground improvement to enable the site for the proposed retail development known as Tawd Valley Centre, Skelmersdale WN8 6LU (The site).
Mynydd Isa, Mold
TR Stabilisation (TRS) were appointed by Robertson Construction Limited (RCL) to undertake Earthworks & Stabilisation to form construction plateaus and formations for a proposed school devel- opment / alterations at Argoed High School, off Bryn Road, Mynydd Isa, Mold CH7 6RY (The site).